image002

 

usa flag.gifVELOCITY XL

“Dr. Tuky”

N478B

 


CONTROL SYSTEMS


 

I started installation of the keel controls during my two-week Head Start Program at the Velocity Service Center

with a lot of input and assistance from S. Swing.   I know that practice makes perfect but I was amazed at

how fast and accurate he is.   Also, just like me, he likes to work clean even if parts will not be visible. 

Upgrades / Options:

XL5 drop-down center keel controls.

Left Arrow: BACK

 

 

 

LINKS TO PHOTOS AND EXPLANATIONS BELOW:

 

 

CENTER KEEL CONTROLS

Control Stick Keel Hard Point

Keel Installation

Rear Aileron Control Bracket

Aileron Trim System (XL-5)

 

CONTROL STICK GRIP

Modification

Faceplate

Faceplate Installation

Switch Installation

Paint

Lettering

 

RUDDER RIGGING

Rudder Pedal Arm Connection

Rudder Cable Conduit

Wing Root Cable Assembly

 

 

 

ELEVATOR TRIM

Actuator Base

Actuator Installation

Trim Spring Installation

 

AILERON RIGGING

Ball Bearing Installation

Aileron Torque Tubes Installation

Aileron Bellcrank Installation at Wing Root

Aileron Control Cables Installation

 

© Jorge A. Bujanda / 2004-2011